MCC permanently employs earth operative machinery including but not limited to, heavy machines, heavy trucks, construction equipment, engineering equipment, heavy vehicles and heavy hydraulics. Our machinery implements five equipment systems in construction operations; traction, structure, power train, control and information.
Our machinery structure can be better understood and analysed with;
List of Machinery Missing (ALL STATIONED IN MUMTAZ CITY)
Dump Trucks x45 (Nissan x20 Hino x15 Volvo x5 Mitsubishi x5)
Prime Movers x5 (Nissan x3 Mercedes x2)
Prime Mover Container x2 (Nissan x2)
Tractors x35 (Belarus x35)
Water Tankers x15 (Nissan)
LIST OF PERSONNEL
ENGINEERS X32
SUB ENGINEERS X30
SURVEYOR X15
DRAFTSMEN X8
ACCOUNTANT X5
WORK SUPERVISORS X15
STEEL FIXERS X 10
OPERATORS X55
LAB TECHNICIANS X6
LAB TECHNICIANS ASSISTANT X 6
TOWN PLANNERS X6